A network of KARBOTECH units at biogas plants across Europe — delivering scalable, verifiable, and permanent CO₂ removal at agricultural scale.
Each CDR node is an existing biogas plant retrofitted with a KARBOTECH unit. The Czech Republic alone has over 700 biogas plants — a ready-made foundation for a national carbon removal infrastructure.
Every unit tracks biomass inputs, biochar output, and field application coordinates. Data feeds directly into third-party verification frameworks including the Isometric Carbon Registry.
The CDR infrastructure creates value at every step: renewable energy from biogas, stable carbon sequestration from biochar, and soil fertility restoration from MicroCHAR® application.
The map shows potential KARBOTECH installation sites — existing biogas plants with the capacity, feedstock, and infrastructure to host a CDR unit. Each pin represents a future node in a distributed carbon removal network.

First operational installation at a Czech biogas plant. MRV data collected, Isometric registry submission completed, audit underway.
Expansion to 10–20 biogas plants across the Czech Republic. Standardised installation procedures, bulk procurement, and centralised MRV reporting.
Replication of the KARBOTECH CDR model in Germany, Austria, Slovakia and beyond — leveraging the 17,000+ biogas plants operating across the EU.
A portfolio of verified CDR credits from a transparent, traceable network — accessible to corporate buyers seeking high-durability carbon removal at scale.
The KARBOTECH CDR infrastructure is designed to feed directly into emerging EU CDR policy frameworks and voluntary carbon markets. Each installation generates a traceable data trail: from biomass feedstock, through pyrolysis conditions, to GPS-verified field application coordinates. This data is aggregated across the network and submitted to third-party auditors for annual verification.
Every tonne of biochar is tracked from pyrolysis unit to agricultural field with full coordinate traceability.
Real-time biomass input and biochar output measurements at every unit feed into centralised reporting.
H/C ratios, heavy metals, and PAH testing ensure every batch meets EBC (European Biochar Certificate) standards.
Data from each node is submitted to the Isometric Carbon Registry for third-party verification and public transparency.
Biogas plant operators, agricultural investors, and corporate CDR buyers — find out how KARBOTECH CDR Infrastructure can work for you.